Chip Seal Projects for 2011
Pickaway County Engineer will begin Chip Seal
maintenance operations in July/August weather
depending. This is part of our annual road maintenance
program, focusing on extending the life of our asphalt
pavements. This process seals the road surface, filling
all cracks with the emulsion and bridging smaller cracks
with the stone. This prevents moisture from entering
the pavement surface and damaging the pavement and subgrade under the roads. We are expecting this
construction project to last approximately two-three weeks.
Signs will be posted at the beginning of each road
segment as well as each intersection warning motorists
of the application of the emulsion and loose stone. The
signs will also include advisory speed placards warning
of a maximum speed of 35 mph with 15 mph, 20 mph, and 25
mph advisory speeds at intersections and curves.
2011 Roads to be Chip Sealed
- Scioto Darby Road from US 62 to London Road
- Judas Road, entire length
-
Lockbourne Eastern Road, entire length
-
Ashville-Fairfield Road from Lockbourne Eastern Road to Walnut Creek Pike
-
Ringgold Northern Road from SR 188 to Ashville Fairfield Road
-
Airbase Road, entire length
-
Tarlton Adelphi Road from Tarlton Corporation limit to Spangler Road, edges only and in various areas
-
Egypt Pike from Ross County Line to South Corporation line of New Holland, edges only
-
Clarksburg Pike, edges only in various locations
-
Florence Chapel Pike, edges only in various locations
-
Durrett Road, edges only in various locations
- Borror Road, edges only in various locations
- Stone Road, entire length
- French Road, entire length
- Kinderhook Road, entire length
- Era Road, entire length
- Commercial Point Road, Florence Chapel Pike to Red River Bridge replacement project limits